Begin by verifying the roof datum lines, then install the supports and fixing brackets. Lay down the insulation and waterproof underlayment. Hoist the metal roof panels into position according to the layout plan, secure them using a locked-seam (standing-seam) technique, and ensure that the panel joints remain straight and aligned. Properly execute the detailing for roof ridges, gutters, and flashings, and apply sealants at all junctions. Inspect the panel surfaces for flatness, ensuring there is no warping or leakage, and provide adequate protection for the finished installation.

|
|
|
|
1.Inspection and Cleaning of the Substrate |
2.Installation of the Vapor Barrier |
|
Clear debris from the surface of the steel decking, ensuring the substrate is dry and level. |
Install the vapor barrier, ensuring tight overlaps and secure bonding with adhesive tape. |
|
|
|
|
3.Installation of the Insulation Layer |
4.Installation of the Waterproof Layer |
|
Lay the insulation according to the layout plan, staggering the joints and ensuring it is compacted and level. |
Apply the waterproof membrane or coating, ensuring there are no voids (hollow spots) or leaks. |
1.The structural layers must be continuous and complete, with tight overlaps that meet design specifications.
2.The insulation layer must be laid flat, with no loose sections or gaps.
3.The waterproof layer must be reliably integrated with the metal roof panels to form an effective, watertight system.
For more information needed or any inquiry,please feel free to contact Yumisteel team.